MEMBERS ONLY LOGIN

This is to access the Members Only Portal. You must be an active CIQS Member to be able to access this secured section of the website. To login please enter your email address and password into the appropriate fields below.

 
  • Establishing budgets from information provided at the feasibility stage, which may be limited to a schedule of net area requirements before any drawings are produced
  • Establishing budgets from information provided at the feasibility stage, which may be limited to a schedule of net area requirements before any drawings are produced
  • Establishing budgets from information provided at the feasibility stage, which may be limited to a schedule of net area requirements before any drawings are produced

View All Members

 

Name

MemberID

Membership

Status

Category

Date Joined

Street

City

  Lee (Brian) Cheuk Ming 246722 OIQS Terminated Construction Estimator Certified 11/2/2002 8C G/F Cleverly St. Sheung Wan
  Lee (Brian) Cheuk Ming 246722 OIQS Terminated Construction Estimator Certified 11/2/2002 8C G/F Cleverly St. Sheung Wan
  Lee (Brian) Cheuk Ming 246722 OIQS Terminated Construction Estimator Certified 11/2/2002 8C G/F Cleverly St. Sheung Wan
  Lee (Brian) Cheuk Ming 246722 OIQS Terminated Construction Estimator Certified 11/2/2002 8C G/F Cleverly St. Sheung Wan
  Lee (Brian) Cheuk Ming 246722 OIQS Terminated Construction Estimator Certified 11/2/2002 8C G/F Cleverly St. Sheung Wan
edit Lee (Brian) Cheuk Ming 246722 OIQS Terminated Construction Estimator Certified 11/2/2002 8C G/F Cleverly St. Sheung Wan
  Lee (Brian) Cheuk Ming 246722 OIQS Terminated Construction Estimator Certified 11/2/2002 8C G/F Cleverly St. Sheung Wan
9123b3305325ab1e54d8c868356c0910